This memo addresses issues with chemical residue limit calculations when carried out on an equipment train basis. The key element to discuss is whether it is appropriate to separately calculate limits for each item in an equipment train based on the total batch size but using only the area for that specific equipment item in the train. Before that is discussed, we will cover the basis (conventional and common) approach of using both the total batch size and cumulative equipment area to derive one L3 limit (for example, in mcg/sq cm) that applies to each item in the train. For clarity, we will call this Case 1. After that, we will focus on potential issues if individual equipment areas are used for separate L3 limits. We will call these calculations Case 2. After discussing those Case 2 problems, we will balance those concerns by briefly mentioning Case 3 (a βstratified samplingβ approach) which has elements of Case 2 but is a clearly different approach to setting limits. Stratified sampling has been previously covered in detail in memos of March, April, and May of 2010.
Each of these cases involves multiple equipment items used sequentially in the manufacturing process. Sequentially here means a situation where the product is processed first with Equipment A, and then Equipment B, and then Equipment C, and so on. [Note that if multiple equipment items are used for the same processing step, please consult the Memos of November and December 2016, dealing with a βsplit batchβ, for how that might be handled.]
Β
Case 1 Approach
Generally for such a sequential equipment train, the Batch Size is for the total drug product processed in the manufacturing equipment. And the Surface Area is the total equipment surface for the entire train. That is, the sum of the areas of Equipment A, plus Equipment B, plus Equipment C, and so on. The typical limit calculation for cleaning validation for drug products is something like this:
Β
Where:
L3 is the limit of the API per surface area, typically in mcg per square centimeter (or per square inch)
PDE is the Permitted Daily Exposure of the active (API) in the cleaned drug product, which also could be expressed as ADE (Acceptable Daily Exposure) or perhaps 0.001 of the minimum therapeutic dose of the active (API) in the cleaned drug product
Batch Size is the maximum size (typically in mass or volume units) of the next drug product
Max Daily Dose is the maximum daily dose of the next drug product
Surface Area is the equipment product contact surface area (sq cm or sq in)
The above approach results in the same L3 limit for each of the equipment items in the train, which could be expressed in terms of L4a (mcg per swab), or L4b (mcg per mL of extracted swab solution), or L4c (mcg/mL or mcg/mL for rinse samples).Β
Β
Case 2 Approach
We have seen cases where, realizing that the difficulty of cleaning varies with each equipment item, firms will set surface area limits in a different way. This different way involves treating each equipment item separately utilizing the entire batch size but only the surface area of that specific equipment item for the L3 calculation. Unless each equipment item has the same Surface Area, the calculated L3 values will be different, which may (or may not) reflect any difference in terms of the difficulty of cleaning. Why is this problematic?Β The reason is that this Case 2 approach may result in a total carryover to the next product which may be unacceptable. Here is an example with just three equipment items, A, B, and C.
Letβs assume a PDE value of 2 mcg, a total batch size 200 kg (or 200000 g), a maximum daily dose of the next drug product of 1 gram, and with surface areas of 100000 sq cm for Equipment A, 150000 sq cm for Equipment B and 75000 cm for Equipment C. Examples below are calculations for the two approaches (cumulative versus individual surface areas) for both L3 and L2, with L2 being the total amount carried over calculated as βPDE X Batch Sizeβ.
For a typical cumulative surface area calculation, here are the calculations for L3 and for L2. There is no need to calculate L4 values for either example because the relative difference illustrating potential problems is adequately expressed by L3 and L2 values.